This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
This project is designed to allow you to complete primary components of a quality improvement project. The information and data will be provided to you in class and/or in documents. You will use this information to work through the Six Sigma DMAIC process. This is the second phase of this project.
· This Phase of your term project is due via the Assignment Link by
11:59 PM, Eastern. Sunday on the due date
.
· This Phase of your term project is worth 75 of the 300 total points for the project.
· Late Work will not be accepted.
In this phase, you will be required to complete the Measure phase of the problem. You will need to define the Critical to Quality elements and how to measure them. Data will be provided to you, and you must develop Control Charts for the CTQ data. These measurements are for the baseline period. The baseline period is the period of time prior to you implementing the project change(s). Later, in the Control Phase, you will compare the baseline period to the periods after the process change(s) are made. This allows you to see if the project changes actually identified the root cause and corrected/improved the process.
Make certain you are referring to the Discussion Forum on the CTQ measurements before you recommend your CTQ’s.
1. Develop Critical to Quality components of this project for both internal and external customers. Following the discussion on the forum this week,
your instructor will determine which CTQ elements will be used.
a. For each of these, write a short section on how this process is measured.
2. Prepare baseline measurement control charts based on the data file that has been provided to you.
a. One Chart for each measurement. See notes on the require chart format
b. Baseline control charts must be prepared in Excel and copied into your project Word document once you are done. You will submit ONLY the Word document that will include the copies of the charts.
Chart Requirements:
1. Each Chart must have a title.
2. All Charts are LINE charts.
3. All periods are on the Chart.
4. The LOWER limit on the vertical axis is set to be slightly less than the lowest data point value. This is REALLY IMPORTANT
5. The UPPER limit on the vertical axis is set to be slightly more than the highest data point value. This is REALLY IMPORTANT
6. The vertical axis is properly formatted for the correct type of value ($, %, or count)
7. Each chart must have a TREND line.
Example Chart
Grading Rubric:
1. Document is professionally written using the language of Business and of Six Sigma.
2. Document is written as if it were being presented to a Senior executive and sponsor of your project.
3. Document is formatted as if it were being presented to a Senior executive and sponsor of your project.
4. Was the procedure for the use of the tools followed correctly? For this assignment specifically, were the specific instructions for chart format followed.
5. Spelling, Grammar, and Format.
Why Work with Us
Top Quality and Well-Researched Papers
We always make sure that writers follow all your instructions precisely. You can choose your academic level: high school, college/university or professional, and we will assign a writer who has a respective degree.
Professional and Experienced Academic Writers
We have a team of professional writers with experience in academic and business writing. Many are native speakers and able to perform any task for which you need help.
Free Unlimited Revisions
If you think we missed something, send your order for a free revision. You have 10 days to submit the order for review after you have received the final document. You can do this yourself after logging into your personal account or by contacting our support.
Prompt Delivery and 100% Money-Back-Guarantee
All papers are always delivered on time. In case we need more time to master your paper, we may contact you regarding the deadline extension. In case you cannot provide us with more time, a 100% refund is guaranteed.
Original & Confidential
We use several writing tools checks to ensure that all documents you receive are free from plagiarism. Our editors carefully review all quotations in the text. We also promise maximum confidentiality in all of our services.
24/7 Customer Support
Our support agents are available 24 hours a day 7 days a week and committed to providing you with the best customer experience. Get in touch whenever you need any assistance.
Try it now!
How it works?
Follow these simple steps to get your paper done
Place your order
Fill in the order form and provide all details of your assignment.
Proceed with the payment
Choose the payment system that suits you most.
Receive the final file
Once your paper is ready, we will email it to you.
Our Services
No need to work on your paper at night. Sleep tight, we will cover your back. We offer all kinds of writing services.
Essays
No matter what kind of academic paper you need and how urgent you need it, you are welcome to choose your academic level and the type of your paper at an affordable price. We take care of all your paper needs and give a 24/7 customer care support system.
Admissions
Admission Essays & Business Writing Help
An admission essay is an essay or other written statement by a candidate, often a potential student enrolling in a college, university, or graduate school. You can be rest assurred that through our service we will write the best admission essay for you.
Reviews
Editing Support
Our academic writers and editors make the necessary changes to your paper so that it is polished. We also format your document by correctly quoting the sources and creating reference lists in the formats APA, Harvard, MLA, Chicago / Turabian.
Reviews
Revision Support
If you think your paper could be improved, you can request a review. In this case, your paper will be checked by the writer or assigned to an editor. You can use this option as many times as you see fit. This is free because we want you to be completely satisfied with the service offered.