Kingdom of Saudi Arabia
Ministry of Education
Saudi Electronic University
المملكة العربية السعودية
وزارة التعليم
الجامعة السعودية الإلكترونية
College of Administrative and Financial Sciences
Assignment 2
Quality Management (MGT 424)
Due Date: 04/09/2022 @ 23:59
Course Name: |
Student’s Name: |
Course Code: |
Student’s ID Number: |
Semester: S |
CRN: |
Academic Year: |
|
For Instructor’s Use only
Instructor’s Name: |
|
Students’ Grade: Marks Obtained/ |
Level of Marks: High/Middle/Low |
General Instructions – PLEASE READ THEM CAREFULLY
· The Assignment must be submitted on Blackboard (
WORD format only) via allocated folder.
· Assignments submitted through email will not be accepted.
· Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the cover page.
· Students must mention question number clearly in their answer.
·
Late submission will NOT be accepted.
· Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions.
· All answered must be typed using
Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted and will be considered plagiarism).
· Submissions
without this cover page will NOT be accepted.
Learning Outcomes:
1. Recognize the importance of quality management theory, principles, and practices applied in businesses on national and international levels. (CLO1)
2. Use quality improvement tools and practices for continuous improvement to achieve the organizational change and transformation. (CLO3)
3. Develop analytical skills of identifying pitfalls, or quality concerns through assimilated and strategic planning.( CLO4)
Improving Quality Management in organizations
Search online for the case study “Case Study on Improving Quality Management of W Company’s New Product Development Project”, or use the link below :
https://www.researchgate.net/publication/276003242_Case_Study_on_Improving_Quality_Management_of_W_Company’s_New_Product_Development_Project
Answer the following questions:
1- Explain the project quality management as indicated in the case study, how it can be beneficial to the organizations? ( 200 words – 3 points)
2- Based on the case study, describe the W company` state prior the implementation of the quality management – new product development project?
In other word, what are some issues that required actions to solve by the company`s management? ( 250– 300 words – 3.5 points )
3- Illustrate three to four tools used by W company to enhance their new product development` quality management? To which extent these methods were effective. (250 – 300 words – 3.5 points)
Answers
1.
Answer-
2.
Answer-
3.
Answer-
4.
Answer-
5.
Answer-
Technology and Investment, 2013, 4, 153-163
http://dx.doi.org/10.4236/ti.2013.43018 Published Online August 2013 (http://www.scirp.org/journal/ti)
Case Study on Improving Quality Management of W
Company’s New Product Development Project*
Jiangping Wan1,2, Ming Zeng1
1School of Business Administration, South China University of Technology, Guangzhou, China
2Institute of Emerging Industrialization Development, South China University of Technology, Guangzhou, China
Email: scutbmwjp@126.com, zm656690@qq.com
Received April 23, 2013; revised May 23, 2013; accepted June 1, 2013
Copyright © 2013 Jiangping Wan, Ming Zeng. This is an open access article distributed under the Creative Commons Attribution
License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
ABSTRACT
Case study on improving quality management of W company’s new product development project includes the analysis
of the current situation within the quality management of W company’s new product development project (current
situation and identify existing problems), improvement study (analysis the cause of existing problems and design the
improvement scheme) and implementation. Through monitoring the implementation process, we have an evaluation
analysis for the implementation results. The purpose of this study is to improve quality management of new product
development project.
Keywords: New Product Development; Quality Management; Quality Improvement; Analytic Hierarchy Process;
Cause; Effect Diagram; Case Study
1. Introduction
The definition given by ISO9001:2000 is “Quality is the
degree to which a series of inherent characteristics meet
the requirements” [1]. Nowadays, the quality not only re-
fers to the specific product quality, but also more empha-
sizes on product performance to achieve customers’ sat-
isfaction. The core of TQM (Total Quality Management)
is “Three-Full-Management”, namely comprehensive qua-
lity management, the whole process quality management,
quality management participated by all the staff [2]. At
the same time, 6 Sigma management technology, MSA
(Measurement System Analysis) technology, and other
methodologies have been introduced to the management,
these methodologies provide a systematic solution to the
quality management of new product development project
[3].
W Company, which has conducted business over twenty
years, is located in Chinese mainland, Hong Kong, Tai-
wan, the United States and other countries and regions.
W company takes “innovative technology and leading
products” as the principle, and promises the integrity,
compatibility, security, stability of the system for two
reasons. On one hand, it relies on the product technology,
quality of service, and the advantages in research, devel-
opment, production sales and service. On the other hand,
it is attributed to the cooperation with well-known uni-
versities and research institutes, as well as the interna-
tional technology change. This makes the win-win rela-
tionship between the company and customers. The suc-
cess of W company makes contribution to its strong im-
proving solution to the project quality management of the
new product development.
This paper is structured in the following: Section 2 is
literature review, including the theory of project quality
management, the theory of the quality management of
new product development project, and the introduction of
tools and methods in the quality management of new pro-
duct development project. Section 3 analyzes the current
situation of the quality management of new product de-
velopment project. Section 4 is the improving study to
the quality management of new product development pro-
ject. Section 5 describes the implementation process and
effect analysis of the improving scheme. Section 6 is the
conclusion.
The definition of the project quality in project quality
management includes both the quality of project process
and the quality of project product, which aims to empha-
*This research was supported by Key Project of Guangdong Province
Education Office (06JDXM63002), NSF of China (70471091), and
QualiPSo (IST-FP6-IP-034763).
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG 154
size the customers’ satisfaction. Project quality manage-
ment finishes related activities mainly with quality plan,
quality assurance, quality improvement and other appro-
aches [4]. Management activities include various activi-
ties related to all the management functions, which can
decide the strategies, responsibilities and objectives of
quality work [5] (Figure 1).
The quality management of new product development
project is based on project quality process management.
And the establishment of quality plan and quality target,
implementation of quality assurance plan, quality impro-
vement scheme, quality measurement and deviation ana-
lyses of the new product development project constitute
the quality management activities of new product develop-
ment project [6]. These four parts accord with the PDCA
cycle, which keep cycling to ensure the product develop-
ment quality (Figure 2). Quality targets of the new pro-
duct development project are the purpose of the constant
pursuit for quality of product development project. The
quality plans of new product development project are the
specific implementation of the quality targets of the new
product development project. And quality controls of new
product development project mean a variety of methods
and measures taken for the completion of the quality tar-
gets, which are devoted to finishing the quality manage-
ment targets of new product development project. The
quality assurance of new product development project
not only includes the internal quality assurance of the
project, but the external quality assurance provided for
customers and other stakeholders. At the same time,
quality improvement of new product development pro-
ject realize its quality targets by improving process qual-
ity, it’s a continuous quality activity to improve the effi-
ciency and effectiveness. Furthermore, the quality im-
provement has six main steps: Ascertain the improving
problems, understand current situation, identify the causes,
formulate measures and carry out, monitor the imple-
mentation process, prevent recurrence and standardize
the solution [7].
Cause-and-effect diagram, also known as fishbone dia-
gram, is a method for analyzing cause and effect. This di-
agram is invented by Kaoru Ishikawa, a Japanese man-
agement master, so it is also named Ishikawa diagram.
Cause-and-effect diagram can help us identify the basic
reasons of the problems and show them with fishbone.
As a non-quantitative research tool, Cause-and-effect dia-
gram has been fully applied in industrial production, me-
dical treatment, education and other areas [8].
Analysis hierarchy process, which is called AHP, is a
kind of multi-objective decision-making method combin-
ing quantitative methods with qualitative methods [9], it
is put forward by American scholar A. L. Seaty in 1970s
[10]. This method can make the various elements in a
complex system layered and organized causing the ele-
Figure 1. The main flow of project quality management.
Figure 2. The PDCA cycle of quality management of new product development project.
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG 155
ments in the same layer relatively independent. On this
basis, we can quantitatively describe the relative impor-
tance for the elements through qualitative judgment [11].
Meanwhile, we can use mathematical theories computing
the weight of the elements in the same layer. If there is
many layers in AHP model, we should normalize and
compute the relative weight in the whole model after
confirming the weight of the last layer. The solution layer
is under the index layer, therefore, we should get the total
score in solution layer by calculating the score for every
solution in this layer, which is mathematically computed
by scoring for elements in the last layer of the index layer
for one solution. We should ascertain the research ques-
tions firstly, then establish the structure model which
includes target layer, criterion layer and plan layer to
form a hierarchical structure with Analytic Hierarchy Proc-
ess (AHP); and score every element related to current
layer and quantify their relative importance to their upper
strata element, form quantitive judgment matrix using 1 –
9 scaling method; judge matrix to see whether it has the
consistency condition with the consistency index con-
tained in data, calculate the relative importance coeffi-
cient of every layer comparing with the one of upper
strata; standardize the weight of each layer relative to the
overall goal to get the priority weight, Then do consis-
tency check for every layer from high to low; finally,
analyze and summarize.
3. Analysis of Current Situation within the
Quality Management of W Company’s
New Product Development Project
3.1. Requirement of the Quality Management of
W Company’s New Product Development
Project
The activities of the quality management of W company’s
new product development project must comply with the
company’s quality policy, namely “excellent technology,
high-quality products, credible and sincere service”. Also
W company develops a quality policy of reducing nox-
ious substance (HSF quality exemption policy), that can
prevent pollution, reduce the cost and be continuous im-
provement. W company developed a general goal of qual-
ity from four aspects: The products’ defect rate listed
through major design is zero, the system total score for
checking should be more than 90, the site products’ fail-
ure rate is less than 10%, the customer satisfaction is
greater than or equal to 93%.
3.2. Status of the Quality Management of W
Company’s New Product Development
Project
The quality management of W company’s new product
development project uses ISO9001:2000 standard, at the
same time, makes a tailoring in terms of the quality man-
agement system. 1) W company recognizes the process
involved and forms specific files; 2) W company’s quali-
ty management system can implement and maintain
within the internal, and strive to achieve continuous im-
provement; 3) The managers are in charge of the estab-
lishment and maintenance for the organization’s quality
management system. Departments are responsible for the
system implementation and maintenance, keeping conti-
nuous improvement for their own department; 4) W com-
pany can provide, utilize and effectively manage the re-
quired resources needed for quality activities during the
new product development process, and ensure the infor-
mation transfer effectively through a variety of internal
meeting; 5) Monitor the customer satisfaction using the
internal quality audit; 6) W company develops the corre-
sponding process to control outsourcing process.
3.3. Problem Identification of the Quality
Management of W Company’s New Product
Development Project
Through conducting a semi-open examination and dis-
cussing with quality control groups of this company, we
find out 20 problems existing in the quality management
of new product development project: 1) The reliability
performance of new products is poor, the repair rate is
too high, there are a lot of batch problem, there is a huge
gap from the target; 2) The quality of the new product is
unable to support the rapid development of business, new
product has a lot of problems of concession, the stop line
is serious; 3) The performance of purchase quality is
poor, the majority of the materials can not achieve the
basic goal of quality requirements, they bring great pres-
sure on the processing and assembly process, the result is
the quality of new product is unstable; 4) Customer com-
plaints increased obviously, the cost pressure of the ser-
vice significantly increased; 5) The quality organization
can’t support all business of W company very well; 6)
The roles and responsibilities is not clear within the qual-
ity management organization; 7) The organizational struc-
ture of IPD (integrated product development) model is pre-
liminary established, IPMT (integrated portfolio manage-
ment team)/PDT (product development team) organization
haven’t yet to be further promotion, no more form a ma-
ture mode; 8) Quality management activities are not clear,
communication and reporting system is not smooth; 9)
The process system is not integrate; 10) The evaluation
of process system is not perfect; 11) The design standards
of new product are not perfect; 12) The standard system
of the new product quality is not perfect; 13) The quality
target decomposition mechanism is not perfect; 14) The
project planning and kickoff phase lack of management;
15) Lack of monitoring and evaluation mechanism for
new product project; 16) The management for new pro-
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG 156
duct project data is weak; 17) The description for the re-
quired ability of post is not clear, the resources are not
fully utilized; 18) The support of IT tools for business is
not enough; 19) Excellent engineering method and con-
crete practice are not effective implement within the com-
pany; 20) The quality awareness between employees is
poor, training is not effective implement.
4. Improvement Research of Quality
Management of W Company’s New
Product Development Project
4.1. The Cause Analysis of the Quality
Management of W Company’s New Product
Development Project
4.1.1. The Identified Process for the Cause of
Problems
Based on the Cause and Effect Diagrams of the problems
existing in the quality management of W company’s new
product development project, we reveal 31 causes (Fig-
ure 3).
4.1.2. Cause Cluster Analysis and Weight Design
1) The process of Cluster Analysis
Through clustering analysis for 31 influencing factor,
we get a result as shown in Table 1.
2) The Process of Weight Design
We allocate the weight of key affecting factors with
Analytic Hierarchy Process (AHP). The first layer is the
target layer, namely the quality management of W com-
pany’s new product development. The second layer is the
index layer factors.
We get the marking result of 10 experts within W
company using the expert scoring method, and then we
handle the marking result with Expert-Choice.
In Table 2, A represents the problems existing in the
quality management of W company’s new product de-
velopment project, B1 represents “Quality management
system of new product development project is not per-
fect”, B2 represents “The executive ability of quality man-
agement organization is insufficient”, B3 represents “Proc-
ess system is not ability of quality management organiza-
tion is insufficient”, B4 represents “Procurement quality
control is weak”, B5 represents “The values of employees
deviate from Business goals”, B6 represents “The train-
ing scheme for Employees is not reasonable”, B7 repre-
sents “The enterprise basic resources are not effective
utilize”. According Table 2, we sort the key affecting fac-
tors (Table 3).
4.2. Improvement Scheme Design for Quality
Management of W Company’s New Product
Development Project
Basing on the analysis of the 7 key affecting factors, we
design a quality management improvement scheme for
W company’s new product development project.
4.2.1. Reinforce Construction, Implementation of
Process System and Improve Execution of
Quality Organization
First we should strengthen the execution of the process.
It requires the support of management, fully authority to
IPD. On this basis, the IPD organization is able to effec-
tively carry out the internal and external communication,
coordinate various departments involved in the activities
of quality management within new product development
project, establish an effective communication platform.
At the same time, indoctrinate the idea of improving the
overall efficiency according to the process to all the staff
of W company.
Secondly, promote vigorously the IPMT method in the
internal organization during the development process of
new product within W company, improve organization
process. As core organization of new product develop-
ment, IPMT must exist in a cross-functional team form,
IPMT organizational structure design is shown in Figure
4.
Finally, according to the existing problem which lacks
of assessment mechanism in process system, we should
use corresponding statistical analysis tools to analysis the
effect of process implementation, which mainly includes
the analysis of measuring system (MSA), statistical proc-
ess control (SPC) technology introduce the defects analy-
sis matrix.
4.2.2. Complete Quality Management System of New
Product Development Project
First of all, carry out the quality management system of
new product development project. Improve the quality of
management organization, clarify corresponding assign-
ment of responsibility, empower the corresponding right.
So W company redesign the quality system of new product
development, modify the quality organization structure.
RD represents research and development, SM repre-
sents sales and marketing, PD represents product devel-
opment, ES represents engineering services, PE repre-
sents process engineering, QM represents quality man-
agement, PM represents planning management, PU repre-
sents purchasing, MC represents manufacturing, CP repre-
sents corporation planning, HR represents human resources,
SR represents software research, TR represents technical
research, IN represents information, VB represents soft-
ware research, IB represents software research, SC repre-
sents supply chain (Figure 5, VB, IB, SC will involve in
Table 4).
After ensuring the functional architecture of quality
management organization, we should implement the qual-
ity management system of new product development pro-
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG
Copyright © 2013 SciRes. TI
157
Figure 3. Cause and effect diagram of problems in the quality management of new product development project.
4.2.3. Intensifying Training of Workers to Promote
Their Quality Consciousness, and Making a
Career Planning for the Staff
ject into practical work and distribute the different fac-
tors involved in quality system to the practical activity of
relevant functional departments (Table 4).
W company passes through the following measures to
improve the “employee values deviate from the enterprise
target” and “employee training plan is not reasonable”:
Enhance staff awareness of new product development
project quality management and staff training quality con-
sciousness; conduct several training for employees which
include management knowledge, professional knowledge
(software and hardware), product knowledge, process stan-
dards and generic skills ;the training contents are divided
into internal training and external training; establish cor-
Second, establish and improve the technique review of
new product development. The technical review of new
product development new applies to all activities of W
company’s new product development project, has a great
support for the new product development project. De-
tailed technical review ensures that the success of W
company in the following activities of new product de-
velopment, makes W company walk in the forefront of
the industry. The definition involved in new product de-
velopment project is showed in Table 5.
J. P. WAN, M. ZENG 158
Table 1. The result of cause cluster analysis for problems in the quality management of new product development.
Number Classification result Influence factors (the cause of problems)
Lack of quality monitoring
Without quality assessment when introducing new module
Lack of monitoring for the production process
Lack of quality assessment for the stage of research and development
The new product quality standard setting is not unreasonable
1
Quality management system of new product
development project is not perfect
No fully implement the periodical technology review
Quality control system is not integrate
Quality management organization’s power and responsibility is not clear
The construction of innovative R&D team is in the preliminary stage
Internal and external communication is not smooth
Inter-departmental coordination is not smooth
Communication mechanism is not perfect
2
The executive ability of quality management
organization is insufficient
The kickoff phase process of New product is not effective combine with IPMT process
The development process is not implement very well
Process evaluation mechanism is not perfect
The design of new products is not standardized
Quality target decomposition mechanism is not reasonable
3 Process system is not perfect
Research and development goals are not in accordance with market demand
The material purchasing cycle is too long
Material processing problems 4 Procurement quality control is weak
The degree of supplier management and monitoring is not enough
The employees’ service consciousness is not strong
The consciousness of quality management within design staff is not strong 5
The values of employees deviate from business
goals
The employees’ quality awareness is poor
The training mechanism is not perfect
The training goal is not effective combine with business objectives
The design ability of R&D team is insufficient
Lack of experience in quality management
6
The training scheme for employees is not
reasonable
The definition of post requirements is unclear
Data management ability is poor
7
The enterprise basic resources are not effective
utilized The IT tool is not effective combine with business goals
Table 2. AHP calculation result.
A B1 B2 B3 B4 B5 B6 B7 Wi Consistency checking
B1 1 2 1/2 4 3 2 6 0.226
B2 1/2 1 1/3 3 3 2 5 0.168
B3 2 3 1 5 3 2 6 0.308
B4 1/4 1/3 1/5 1 1/2 1/3 3 0.057
B5 1/3 1/3 1/3 2 1 1/2 3 0.082
B6 1/2 1/2 1/2 3 2 1 3 0.125
B7 1/6 1/5 1/6 1/3 1/3 1/3 1 0.034
C.R. = 0.03
Table 3. The weight allocation table of key affecting factors.
Importance number The name of the key affecting factors Relative weight
1 Process system is not perfect 0.308
2 Quality management system of new product development project is not perfect 0.226
3 The executive ability of quality management organization is insufficient 0.168
4 The training scheme for Employees is not reasonable 0.125
5 The values of employees deviate from Business goals 0.082
6 Procurement quality control is weak 0.057
7 The enterprise basic resources are not effective utilize 0.034
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG 159
Figure 4. IPMT organization structure chart.
Figure 5. Organizational structure chart of quality management activities of new product development.
Table 4. Function allocation table of quality system elements of W company’s new product development.
VB/IB SC ISO9001
ISO9001clause
The relevant documents or procedures GM MR
RD SM PD ES PE QM PM PU MC
CP HR SR TR IN
4.1 General requirements A full set of quality system documents ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
Quality manual ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
Document and material control
procedure
○ ○ ● ○ ○ ○ ○ ● ○ ○ ○ ● ○ ● ● ○4.2 Document requirements
Quality records control procedure ○ ○ ● ● ○ ○ ○ ● ● ● ● ○ ● ● ● ○
5.1 Management commitment Quality manual ● ● ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○
Order review control procedure ○ ○ ○ ● ○ ● ● ○ ● ○ ○ ○ ○ ○ ○ ○
5.2 Customer-oriented
Measurement and analysis of customer
satisfaction control procedure
○ ○ ○ ○ ○ ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○
5.3 Quality policy Quality manual ● ● ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○
5.4 Planning
Control procedure of quality
management system planning
○ ● ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○
5.5 Responsibility, authority
and communication
Internal information communication and
control procedure
○ ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○
5.6 Management review Management review control procedure ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
6.1 Resources supply Quality system documents ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Human resources control procedure ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○
6.2 Human resources
Staff training control procedure ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○
6.3 Infrastructure
Infrastructure management control
procedure
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ●
6.4 Working environment Working environment control procedure ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○
7.1 Planning of product
realization
Quality system documents ○ ○ ● ○ ○ ● ● ● ● ○ ○ ○ ○ ● ● ○
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG
Copyright © 2013 SciRes. TI
160
Continued
7.2 Customer-related process Order review control procedure ○ ○ ○ ● ○ ● ● ○ ● ○ ○ ○ ○ ○ ○ ○
7.3 Design and development Product development control procedure ○ ○ ● ○ ● ○ ● ● ○ ● ● ○ ○ ● ● ○
7.4 Purchasing
Purchasing management control
procedure
○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○
Productive process control procedure ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○
Productive planning control procedure ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○
Identification and traceability control
procedure
○ ○ ● ○ ○ ○ ○ ● ● ● ● ○ ○ ● ● ○
7.5 Production and service
provision
Material management control procedure ○ ○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○
7.6 Monitoring and measuring
device
Monitoring and measuring device
control procedure
○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○
8.1 General rules Management review control procedure ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Measurement and analysis of customer
satisfaction control procedure
○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Internal quality review control procedure ○ ● ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○8.2 Monitoring and measuring
Materials and process inspection control
procedure
○ ○ ○ ○ ○ ○ ○ ● ○ ○ ○ ○ ○ ○ ○ ○
8.3 Off-test product control Off-test product control procedure ○ ○ ○ ○ ○ ○ ○ ● ○ ● ● ○ ○ ○ ○ ○
8.4 Data analysis Data analysis control procedure ○ ○ ● ○ ○ ● ● ● ● ● ● ○ ○ ● ● ○
Corrective and preventive measure
control procedure
○ ○ ● ○ ○ ● ● ● ● ● ● ● ● ● ● ○
8.5 Improvement
The customer service request
(complaint) control procedure
○ ○ ○ ○ ○ ● ○ ● ○ ○ ○ ○ ○ ○ ○ ○
Notes: Sponsor ● Co-Organizer ○ GM-general manager MR-management representative.
Table 5. The definition and explain involved in technique
review of new product development project.
Abbreviation Explain
TR Technique Review
DCP Decision Check Point
IPD Integrated Product Development
IPMT Integrated Product Management Team
PDT Product Development Team
SE System Engineer
PQA Product Quality Assurance
LPDT PDT Leader
responding promotion mechanism and incentive mecha-
nism.
4.2.4. Upgrade Suppliers’ Management Level
W company passes through the following measures to in-
tensify the management of supplier: refer to quality ma-
nagement system of the company’s new product devel-
opment project, develop a detailed examine and verify
mechanism and improve the qualified suppliers manage-
ment standards for the quality and schedule of purchased
material.
4.2.5. Improve Resource Utilization Efficiency
W company’s management ability is relatively poor for
basic resources, mainly there is not effective use in the IT
tools and not very good to support company business de-
velopment.
5. Implement and Effect Analysis of
Improvement Scheme in Quality
Management within W Company’s New
Product Development Project
5.1. Implement of Improvement Scheme of
Quality Management of W Company’s New
Product Development Project
W company’s 5 measures based on the improvement
scheme of new product development project quality include
5 stages (Figure 6), namely concept formation, planning,
new product development, validation and product release.
TR1 to TR6 is 6 promotion of review process, each re-
view is a sublimation to the last review. Each review
process includes four parts: periodical quality objectives
decomposition, monitor and measure periodical index,
data analysis improvement and summarize and periodical
project quality brief report. Four processes keep conti-
nuous cycle, promote the continuous upgrade of the ac-
J. P. WAN, M. ZENG 161
tivities in quality management of new products.
5.2. Implement Effect Analysis of the
Improvement Scheme of the Quality
Management of W Company’s New Product
Development Project
5.2.1. Comparison and Analysis of New Product’s
Defect Rate
W company uses Measurement Systems Analysis (MSA)
technology to get part of new products’ defect data. Then
they get the state of a new product’s defect discovery and
phase defect removal rate using defect introduce-disco-
ver matrix method to analysis the obtained data (Table
6).
As a result of the improvement scheme of the quality
management of W company’s new product development
project, a new product’s defect situation is lower than
target value, phase defect removal rate is higher than
lowest requirements.
5.2.2. Comparison and Analysis of New Product’s
Failure Rate
New Product’s Failure rate refers to the ratio of the fail-
ure numbers of new product in a certain period of time
and the ones in the whole statistical period (12 months)
(Table 7). After using the improvement scheme of the
quality management of new product development project,
The number, failure rate of new product dropped signifi-
cantly, The effect of the improvement scheme of the qua-
lity management of new product development project is
remarkable when it arrives later period.
5.2.3. Comparison and Analysis of Customer
Satisfaction
This paper applies customer complaint handling to reflect
customer satisfaction of W company after implementing
the improvement program of the quality management of
new product development project (statistical period is one
year) (Figure 7). After using the improvement scheme,
Figure 6. Implement process of the improvement scheme of the quality management of new product development project.
Table 6. Comparison of a new product’s defect situation and phase defect removal rate in W company.
Total defects Highest requirement of defect found Phase defect removal rate Lowest requirements of phase defect removal rate
Actual value Target value Actual value Target value
6 30 100.00% 80.00%
0 20 100.00% 70.00%
5 20 71.43% 70.00%
7 35 100.00% 70.00%
0 40 100.00% 40.00%
38 60 57.58% 40.00%
30 33 100.00% 40.00%
0 10 100.00% 100.00%
0 7 100.00% 100.00%
0 5 100.00% 100.00%
0 5 100.00% 100.00%
Copyright © 2013 SciRes. TI
J. P. WAN, M. ZENG 162
Table 7. The number, failure rate of new product before and after using the improvement scheme.
Running time of
new product
The number of failure before
using improvement program
The number of failures after
using improvement program
Failure rate before using
improvement program
Failure rate after using
improvement program
<1 month 18 3 2.75% 0.39%
1 – 3 months 18 19 2.75% 2.45%
3 – 6 months 23 8 3.52% 1.03%
6 – 12 months 38 9 5.81% 1.16%
Figure 7. The number of customer complaint handlings before and after implementing the improvement scheme.
the number of customer complaint handling declined
more every year. So the improvement scheme has a visi-
ble effect on improving product’s quality and customer
satisfaction.
Through comparison and analysis of defect rate, fail-
ure rate of new product and customer satisfaction, we can
conclude that the improvement scheme of the quality ma-
nagement of new product development project is reaso-
nable, and it has a remarkable effect. At the same time, it
reflects to some extent that key affecting factors model of
the quality management of new product development
project is in line with the actual situation of W company.
6. Conclusion
Case study for improving quality management of W
company’s new product development project is carried
out. We analyze its current situation, identify existing
problems and analysis the cause of existing problems.
Based on these foundations, an improvement scheme of
quality management of W company’s new product de-
velopment project is put forward, and we monitor the im-
plementation of the improvement scheme and analyze its
implement effects. Of course, we just do singleton stud-
ies about affecting factors, process and meaning of prob-
lems. Whether the improvement scheme of quality man-
agement of new product development project has univer-
sal applicability remains to be further research and dis-
cussion.
7. Acknowledgements
Thanks for helpful discussion with Mr. Junqiang Wen, et
al.
REFERENCES
[1] Y. H. Cao, Y. M. Yan and A. C. He, “Application Char-
acteristics of Quality Management System in Enterprise,”
Coastal Enterprises and Science & Technology, Vol. 10,
No. 6, 2005, pp. 56-60.
[2] M. H. Liu, “The New Development Tendency of Total
Quality Management,” Liaoning Economy, Vol. 25, No. 8,
2006, pp. 83-84.
[3] K. Hale, “Measuring Organizational Effectiveness and Bu-
siness Performance in Firms Implementing Total Quality
Management,” International Journal of Manufacturing
Technology and Management, Vol. 8, No. 4, 2006, pp.
355-378. doi:10.1504/IJMTM.2006.009244
[4] G. P. Laszlo, “Project Management: A Quality Manage-
ment Approach,” TQM Magazine, Vol. 3, No. 3, 2003, pp.
157-160.
[5] D. G. Hubbard, “Total Quality Project Management,” Pro-
ceedings of the Project Management Institute Annual Se-
minar Symposium, Dallas, 1991, pp. 260-264.
[6] J. Chen, G. Xiang and B. W. Gui, “R & D Project Mana-
gement,” China Machine Press, Beijing, 2004, pp. 15-19.
[7] C. J. Chen, “Apply Project Quality Management in the
Process of New Product Development,” Law and Econ-
omy, Vol. 18, No. 11, 2009, pp. 58-62.
Copyright © 2013 SciRes. TI
http://dx.doi.org/10.1504/IJMTM.2006.009244
J. P. WAN, M. ZENG 163
[8] Y. S. Peng, “Causal Analysis in the Social Science,” So-
cial Science Research, Vol. 26, No. 11, 2011, pp. 14-18.
[9] X. Deng, J. M. Li and H. J. Zeng, “Analytic Hierarchy
Process Weight Calculate Method Analysis and Its Appli-
cation Research,” Mathematics in Practice and Theory,
Vol. 42, No. 7, 2012, pp. 64-67.
[10] A. H. He, “Study on the Decision-Making of Coal In-
dustry Technology Development Based on AHP,” Ad-
vanced Materials Research, Vol. 41, No. 4, 2011, pp.
111-114.
doi:10.4028/www.scientific.net/AMR.204-210.911
[11] S.-H. Li, “Research on Evaluation System of New Energy
Vehicles Based on AHP,” Applied Mechanics and Mate-
rials, Vol. 42, No. 3, 2012, pp. 321-325.
Copyright © 2013 SciRes. TI
http://dx.doi.org/10.4028/www.scientific.net/AMR.204-210.911
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more