Home » Toyota Motor Manufacturing

Toyota Motor Manufacturing

Toyota Motor Manufacturing USA, Inc. , (TMM) is confronted with its rising problem with seat supply and one of the main culprits is the seat defects. Reflected in the decreasing run ratio; as a result there is a growing number of cars sitting off-line with defective seats or no seats at all requiring overtime to make up for the loss production. Another issue worth mentioning is the way TMM handles the defective seats as they deviate towards the Toyota Production System (TPS) norms. The seat supply problem is the major issue because it constricts the company to supply the cars on time to the sales company.
The seat problem resulted with a ten point drop on the run ratio from around 95% down to a meager of 85%. This shortfall is equivalent to 45 cars per shift which will give a potential loss of $73,593,000 / year. This shortcoming requires high overtime for the personnel to cope up with the demand in the market. It notches a 50% premium for overtime, resulting to an additional cost of $7,311,542 per annum. The increasing number of cars sitting off the line with defective seats or with no seats at all, end result to a loss in production because of waiting and rework.
There are 18 vehicles found at the parking area having defects in seats which have an equivalent potential loss in sales with $ 679,320 per annum, based on the 17% pretax profit. Advantage: Immediately address problems at the source 1. (See Appendices for Exhibit 2: Problems Arising from Current Process of Handling Seat – Set Mismatch), aligned with the TPS principles, empower employees to remedy problems therefore preventing inventory of problematic cars sitting at overflow, prevents feedback delay through timely information (See Appendices for Exhibit 3: Simulation of Feedback Delay – Time vs.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Number of Defects). Disadvantage: Standardizing the new process and will incur additional cost for training. (See Appendices for Exhibit 4: Cost Benefit Analysis). Advantage: This would provide additional flexibility for TMM, minimize waiting time, unloads burden from KFS and helps avoid disruption of processes. Disadvantage: Supplier control, time to train the new supplier to match TMMs way of production, and supplier certification cost.
(See Appendices for Exhibit 4: Cost Benefit Analysis). The group recommends implementing all the alternatives. Process improvement in the assembly line by sending TMM – QC personnel to KFS and adding QC inspector at the receiving dock is a worthy investment amounting to $141,440 as compared to the overtime pay of $7,311,542 (See Appendices for Exhibit 4: Cost Benefit Analysis). TMM needs to improve their current problem handling and recovery system.
This alternative is not only financially rewarding (See Appendices for Exhibit 4: Cost Benefit Analysis) but it also supports TPS concept of being dependent on human infrastructure. Lastly, having an additional supplier is recommended for this will further help lighten the burden on KFS as it deals with volume ramp-up and increasing product variations. This alternative aims to eliminate material defects caused by suppliers.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
Live Chat+1 763 309 4299EmailWhatsApp

We Can Handle your Online Class from as low as$100 per week