Automated Power Pole Photography via Helicopters

Fugro Roames aims to automate the process of acquiring high resolution pictures, to reduce the risk and cost associated with helicopter based pole top inspection. The project will focus on acquiring previously worked algorithms, as well as the introduction of model predictive control, to automate the overall process, while also presenting a working prototype to simulate the operation of the intended product.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The following proposal will aim to describe the intended topic and scope, while also reviewing background information on aerial asset management and autonomous aerial photography related to the project. The report will also highlight all achievable milestones, and their respective tasks, within the project plan; as well as present a detailed OH&S risk assessment of the project’s practical and non-practical work.

The work completed during the semester, will hope to provide sufficient groundwork for automated aerial asset management procedures, within the electrical distribution industry.

Accurate and effective asset condition management is important to ensure the longevity of an electric distribution network, while maximising its performance and operational efficiency.[1] At present, an efficient and cost effective method to test the integrity of a network, requires the use of a human-piloted helicopter and a photographer to capture high resolution images of power poles and their subcomponents [2]. Fugro-Roames, a company which currently provides this to its customers, aims to reduce the risk and cost associated with helicopter based pole top inspection, by replacing the photographer with an automated camera gimbal to capture high resolution pictures of the network.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Figure 1.1: Power Pole Photography [1]

Automated aerial asset management in the context of this proposal refers to the use of aerial platforms, to asses specific assets in an easy and cost-efficient manner, without the need of manual involvement. Unfortunately, and as it will be discussed in Chapter 3, the project topic is a form of technology that has not been widely researched; however, various methods of aerial asset management, such as helicopters, UAVs or drones, do exist and are currently in use within the industry.

2.1 Project Outline

It is the purpose of this project to develop a Receding Horizon Planner (RHP) in order to automate power pole photography using camera gimbal system. The RHP will based on the algorithms created by Dr. Michael Kearney, which provide a solution to the photograph feasibility, photograph scheduling, and gimbal trajectory planning problems [3]. For validation, the developed planner will be tested using simulation flight data provided by Fugro-Roames. Further testing will include the implementation of the RHP into a gimbal prototype, where sensitivity analyses and assessment of the initial assumptions will be completed to determine the project’s limitations and outline recommendations for future work. A more defined project plan will be described in Chapter 4 below.

2.2 Motivation for Automated Aerial Asset Management

In order to overcome the limitations associated with conventional asset management methods, a high resolution image capture system was developed and is now used to aid in the inspection, assessment and maintenance of electric distribution networks [4]. However, the overall cost associated with this method, outweights its improved efficiency, as it involves specialized labour (photographers) and the use of helicopters to complete the required task [5]. The motivation to introduce an automated aerial asset management system, requires for the reduction of risks and overall cost associated with the current model, as well as improving the quality and selection of photographs taken.

2.3 Project Aim, Objectives & Intended Scope

Since the project, and all information available, are sponsored and provided by FugroRoames, the aims and objectives have been defined by the company’s desires for the finished product. Therefore, the aim and proposed purpose of the project is to reduce the cost and risk associated with helicopter based pole top inspection, with the use of a Receding Horizon Planner (RHP) that automates the movement and control of a camera gimbal system. Along with the proposed project aim, multiple objectives must also be met whilts completing the work required. These include improving the algorithms created by Dr. Kearney, obtaining accurate efficiency gains for the RHP, designing and building a working gimbal prototype to be used for testing, and providing sufficient ground work for actual on-site testing and implementation, with the use of a helicopter, of the RHP beyond the project. Similar to the project’s aim and objectives, the intended scope has also been shaped by the company’s desires for the final product. Therefore, the scope can be outlined as:

  • Review of background information and related work
  • Adaptation of algorithms created by Dr. Kearney
  • Development of Receding Horizon Planner
  • Design and build of a gimbal prototype
  • Planner implementation and testing
  • Analysis of results
    • Sensitivity analysis
    • Assesment of project’s assumptions
  • Evaluation of project and suggestion for future work
  • Possible gimbal rig implementation and on-site testing

Taking into account the scope described above, it seems logical to break the project into three specific sections; planner development and testing, prototype design and testing, and thorough result analysis. The development and testing of the Receding Horizon Planner involves the improvement of existing control algorithms, to implement and verify its overall efficiency, using available and provided data. The design and testing of the gimbal prototype, which should resemble the actual gimbal rig, involves the use of the developed Receding Horizon Planner to validate and improve previously obtained results. Finally, thorough result analysis requires the breakdown of the planner and obtained results, to find how assumptions, parameters and particular components were affetcted.

Although automated aerial asset management is a form of technology that has not been widely researched, the following chapter will provide a complete review of background literature which would closely resemble the general subject matter. The review will be broken into two sections; aerial asset management, and autonomous aerial photography and gimbal control. Previous work related to these topics will be presented, reiterated and reviewed, focusing on sources related to asset management within the electric power distribution industry.

3.1 Aerial Asset Management

Aerial asset management , within the electric power distribution industry, has been implemented to replace conventional asset management and inspection methods, and provide a fast and accurate way to determine any defects that could be present.

Whitworth et al. [6], in a work sponsored by EA Tecnology, propose the use of a helicopter-mounted camera to capture and store visual information, in order to enhance the inspection of overhead power lines. In order to reduce ‘camera shake’ and partially automate the inspection process, the authors recommend the use of an acquisition system, which finds and locks the camera to the location of the powerline, followed by a recursive algorithm that tracks the powerline smoothly, despite the translation of the helicopter.

Similarly, Earp et al. [1][4] describe an aerial inspection technique, which was also developed by EA Technology, that uses high resoluion images to perform a detailed condition assessment on electrical towers within a distribution network. The authors break down the helicopter based condition assessment, which is considered an improvement from the video inspection method in [6], to include four different parts:

  • Pre-flight Planning: Inspection requirements, photographic sequences, camera trajectories; as well as current wind and weather conditions, natural and man-made ground feature, and the locations of the electrical towers, are all taken into account during the pre-flight planning.
  • Helicopter Inspection and Picture Acquisition: A high resolution digital camera is used to take a set number of images, per tower, to meet the inspection requirements. Satellite-based Global Positioning System (GPS) and moving map displays are used to georeference each photograph taken, back to the tower.
  • Image Processing, Analysis and Condition Assessment: Captured images are examined and given a Condition Rating (CR), typically on a scale of 1 to 4 (1 describing best condition, 4 describing worst condition). The uniformity of the assessment, determined by the individual DNO’s requirements, is ensured by this critical step and therefore requires for a detailed condition assessment criteria, application-specific workstations, and accurate in-house training programme for assessors.
  • Condition Based Risk Management (CBRM): A process developed by EA Technology, it combines practical and theoretical knowledge about a specific asset, along with maintenance experience, in order to define its current condition.

Taking a different approach, N. Ellis [7] investigates the use of Unmanned Aerial Vehicles (UAVs) to inspect power transition lines. The author investigated the cost, risks and overall efficiency that comes with the use of UAVs, searching for low budget automation strategies to be designed and tested. Unfortunately, due to government regulations and the high capital and operating cost of the UAV, lead the author to the conclusion that the technology is not feasible at the current time.

As outlined by most of the sources presented, the introduction of aerial asset management techniques, has made a big improvement on the inspection, assessment and maintenance of an electrical distribution network. Whilst most models present techniques that far surpass conventional inspection methods, the cost that comes with the involvement of specialized labour and helicopters, leaves little room for errors and inconsistent results. However, although the implementation of an UAV was not possible due to the introduction of new risks, the automation techniques, presented in [7], can be applied to previously discussed aerial photography techniques, and mitigate/remove any currently involved risks.

3.2 Autonomous Aerial Photography and Gimbal Control

Autonomous aerial photography and control, within the electric power distribution industry, is not a topic that has been widely researched or implemented. However, the use of a camera and aerial images to predict and control the movement of UAVs is something that is commonly discussed and will therefore, be the main focus for this section.

E. Skjong et al. [8] investigate the recent commercial availability of UAVs within Search and Rescue (SAR) and Search and Tracking (SAT) applications. The authors then focus on the development of a SAT system, which is able to steer the UAV and focus the gimbal attitude on regions and objects of interest respectively, with the use of Model Predictive Control (MPC). The overall process is made autonomous by allowing computer vision to work directly with the UAV autopilot and MPC, so objects can be simultaneously detected and tracked in an efficient manner.

Similarly, C.E. Lin and S. Yang [9] explore the use of UAVs to detect and track specific objects, with the help of aerial photography and camera gimbal control. The authors implement the use of an Inertial Measurement Unit (IMU), which consist of a gyroscope, accelerometer, and magnetometer, along with an Attitude and Heading Reference System (AHRS), to determine and ensure that the angles of the camera gimbal are in the correct reference frame. Both [8] and [9] use Global Positioning System (GPS) to determine the location of both the UAV and the target, using this relationship to implement a reliable autopilot flight control for target detection and photography.

R.J. Rajesh and C.M. Ananda [10] move away from controlling the camera gimbal, attached to a UAV, and focus on stabilizing its movement to ensure that clear photograph and/or video footage is taken. The use of Proportional-Integral-Derivative (PID) controller is recommended by the authors, to compensate for the vibrations and gust, as well as control the position of the camera by stabilizing the movement of the gimbal. Manually tuning the controller’s parameters is not recommended, as the process is considered time consuming and tedious, instead, the authors recommend the use of Particle Swarm Optimization (PSO) as the preferred algorithm to complete this task.

Uncertainty and disturbances are mentioned, but not properly investigated in [9], [8] and [10]. A. Ashok et al. [11] investigate the external disturbances that affect the UAVs, as well as the dynamic and parametric uncertainties that arise in the mathematical autonomous model when subjected to a number of operating conditions. The authors reiterate previous approaches taken to design a robust control system, including the use of a PID controller for linear [12] and linearized [13] models, as well as the use of a Linear Quadratic Gaussian (LQG) controller [14] in the presence of uncertainties, before the Uncertainty and Disturbance Estimation (UDE) method is chosen to synthesize the required controller.

The control of a camera gimbal, as outlined by most of the sources above, is necessary in order to ensure the accuracy of photographs or video that is captured by the UAV. Although the use of conventional control methods is described above, only [8] focuses on the use of MPC, which is closely related to the project, to ensure that the UAV is able to detect and track objects efficiently and simultaneously.

A clear representation of the project’s tasks, has been outlined as a comprehensive project plan from the first to the final day of employment at Fugro-Roames. A visual representation and description of the plan is used to illustrate the timeline of the project, including all achievable milestones, which are related to the aims, objectives and intended scope of the project, discussed in section 1.2.

4.1 Visual Representation of Project Plan

The use of a modified GANTT chart was implemented to showcase the proposed flow of the project, from the first to the last day of employment. The timeline is hence separated into 24 weeks that are broken into 5 days, in the same manner as the business week format, where the project milestones and their corresponding tasks are allocated a precise number of days in which work is scheduled to take place.

Green solid bars represent the project’s milestones, where red solid bars indicate their respective tasks. The progress of the overall project is tracked by the completion of every achievable milestone, which can only be completed by first completing their respective sub tasks. Completed milestones are shown with a blue line through the green bar, and completed tasks are shown with a yellow line through the red bar.

Weeks 1 to 12, as shown in Figure 4.1, represent the core work to be completed, as Milestones 3-5 directly relate to the aims, objectives and intended scope of the project. Weeks 13 to 22, as shown in Figure 4.2, outline the analysis and completion of the final pieces of assessment, including the thesis report and demonstration, which require the content from previous milestones to be completed. Weeks 23 to 24, also shown in Figure 3.2, outline a possible Milestone that can be completed until the final day of employment at Fugro-Roames. This milestone does not affect the previous pieces of assessment; however, it will provide the company with important information that could prove vital to the future of the project.

4.2 Milestone & Task Breakdown

Milestone 1: Project Scope

The project scope is necessary to determine the project’s main objectives, and will therefore guide the work to be completed throughout the semester. To ensure all expectations are met, and the appropriate time is given to all project milestones, an agreement between academic and industry supervisors is necessary.

Task

ID

Days Description

Project evaluation

1.1

5

Evaluate the requirements of the project, including potential goals and outcomes. Collect all necessary information to present during the supervisor meeting.

Supervisor meeting

1.2

1

Meet with the project’s academic and industry supervisors to discuss the project scope, and agree on the due dates for all pieces of assessment.

Scope confirmation & agreement

1.3

2

Compile a detailed scope which highlights the project’s objectives, as discussed during the supervisor meeting.

Resources

  • Workspace with an available computer
  • Availability from both supervisors to organize a meeting

Milestone Hazards and Risks

Milestone 1 is essential to the project. Any delay could be considered a minor, but possible risk, as it affects the progress of the overall project. If this issue becomes bigger, and the project scope cannot be defined, then it can be classified as a major risk and mitigation strategies should be taken immediately.

Clear communication between all parties involved, can reduce and remove the possibility of the identified risks from occurring.

Milestone 2: Project Proposal

The project proposal is the first piece of assessment, which must be completed as part of the responsibilities for completing the project placement. The report highlights the work from Milestone 1, as it expands on the agreed aims and objectives, outlines the background information related to the project’s main topics, and presents a visual and a clear representation of the project plan. A detailed OH&S risk assessment, which analyses the potential risk involved with the project’s practical work, and any potential equipment used, will also be included in the proposal.

Task

ID

Days Description

Research of relevant material

2.1

5

Find background information and prior art related to the project’s main topic.

Project outline and intended scope

2.2

4

Expand on the project’s scope decided in Task 1, expanding on the project’s aims and objectives.

Background and related work

2.3

3

Summarize and expand on the material obtained from Task 2.1.

Project plan summary

2.4

3

Provide a detailed project plan, with logically ordered tasks and their respective milestones.

OH&S risk assessment

2.5

2

Compile an OH&S risk assessment, which highlights the project’s practical work and equipment used.

Drafting and submission

2.5

5

Assemble the proposal’s individual sections, review the written report and submit via

Turnitin.

Resources

  • Completion of Milestone 1
  • Confirmation of university assessment due dates
  • OH&S risk assessments, regarding the use and control of the gimbal rig

Milestone Hazards and Risks

The project proposal relies mostly on individual and previously completed work, however, certain sections require resources which are not readily available. The most significant obstacles, which would require mitigation, are the confirmation of all university assessment due dates and the risk assessments completed for the gimbal rig, which might be used during the project.

Clear and constant communication with the university’s course coordinator, as well as the personnel in charge of the gimbal rig, is essential to mitigate and prevent any issues that could affect the completion of the project proposal.

Milestone 3: Receding Horizon Planner

Milestone 3 is the first milestone that uses the algorithms created by Dr. Kearney to develop an on-line planner that controls the photograph scheduling plan and the movement of the gimbal throughout the event horizon. The completed Receding Horizon Planner will involve the use of a low level controller, an upper level planner, and an event monitor, to be used in Milestones 4→7.

Task

ID

Days Description

Algorithm testing and improvement

3.1

5

Improve the current photograph feasibility algorithm, and test its efficiency.

Model predictive control research

3.2

5

Find related material to be used when designing the Receding Horizon Controller.

Lower level controller design & implementation

3.3

5

The gimbal and camera are robustly controlled by the photograph scheduling algorithm chosen by the upper level planner.

Upper level planner design & implementation

3.4

5

Implemented the improved algorithm from Task 3.1 to generate a plan that the system will follow over a prediction horizon.

Event monitor design & implementation

3.5

4

Connect the results from Tasks 3.3 and 3.4 so that the plan is implemented and changed after certain events occur.

Resources

  • Programming and modelling software
  • Access to the project’s repository and previous work

Milestone Hazards and Risks

The progress of Milestone 3 could be significantly affected, if access to the necessary repositories and previous work is delayed. As previous algorithms are necessary to the development of the Receding Horizon Planner, the completion of the project would be significantly impacted.

Clear communication with the right personnel can help mitigate this issue before it affect the timeline and progress of the project.

Milestone 4: Planner Analysis and Improvement

Rigorous testing of the developed Receding Horizon Planner is required to find the necessary efficiency gains, so the planner can be implemented on the project’s physical equipment. Data obtained from Fugro Roames, as well as the analysis and reiteration of the testing completed, will be completed to improve the found controller gains.

Task

ID

Days Description

Test current and new

scenarios

4.1

4

Implement the Receding Horizon Planner on several simulated scenarios, using data received from Fugro Roames.

Reiteration of Receding Horizon Planner testing

4.2

3

Fix any errors found in Task 4.1 and repeat the tests.

Determine accurate efficiency gains

4.3

3

Determine the required controller gains which provide the most accurate results.

Resources

  • Completion of Milestone 3
  • Sufficient testing data provided by Fugro Roames

Milestone Hazards and Risks

The lack of testing data used to complete this milestone, is a minor risk that could affect the project. Requesting said data ahead of time, would ensure that it is ready for when testing of the Receding Horizon Planner begins, leaving the project timeline unaffected.

Milestone 5: Gimbal Prototype

Milestone 5 marks a key point in the project, as the implementation of the Receding Horizon Planner on a working prototype is essential to the project’s success. The design of the prototype will be based on the actual gimbal rig owned and created by FugroRoames, to facilitate the implementation of the planner for further testing, at the end of the project.

Task

ID

Days Description

Embedded system design and build

5.1

7

Design, build and combine the mechanical, electrical, and software components of the prototype.

Implementation of

Receding Horizon Planner

5.2

6

Test the Receding Horizon Planner using the gimbal prototype.

Sensitivity Analysis

5.3

5

Identify and vary the dominant parameters, testing and improving the Receding Horizon Planner where possible.

Resources

  • Completion of Milestone 4
  • Mechanical, electrical and software design software
  • Working space and necessary build equipment
  • Development of testing scenarios

Milestone Hazards and Risks

Milestone 5 introduces the use of practical equipment to design, test and build each component of the gimbal prototype. The misuse of the practical equipment, and the lack of component testing, are immediate risks to the completion of the prototype. Following the risk assessment outlines on Chapter 4, as well as completing the required testing before the Receding Horizon Planner is implemented, can help mitigate the risks described and prevent possible delays.

Milestone 6: Assessment of Project’s Assumptions

As previously shown by Dr. Kearney, on the initial report he completed for Fugr-Roames, the introduction of the Receding Horizon Planner required changes to the initial assumptions made when designing the project’s photograph allocation and gimbal control algorithms.

The change and/or the addition of assumptions, by analysing the project’s missing parameters is, therefore, also essential when validating the results obtained in Milestone

5.

Task

ID

Days Description

Identify missing parameters

6.1

2

Determine the project’s missing parameters based on the assumptions made by Dr.

Kearney on his report.

Evaluate the effects of missing parameters

6.2

3

Assess how the model is affected by each missing parameter.

Update the project’s assumptions

6.3

2

Compose a list of updated assumptions based on the results from tasks 6.1 and 6.2, to be used on further work.

Resources

  • Completion of the Sensitivity Analysis Task within Milestone 5

Milestone Hazards and Risks

The risks to Milestone 6 are relatively small, where the largest possible problem involves the inability to identify the effects of the project’s missing parameters. Keeping a record of all parameter changes/assumptions made during previous tests is the best solution to mitigate/prevent this issue.

Milestone 7: Project Evaluation and Recommendation for Future Work

Identifying the project’s limitations is an important process, as it allows recommendations for future work to be made and included on the final thesis report.

Task

ID

Days Description

Identify project’s limitations

7.1

3 List the project’s limitations, based on the results from Task 6.

Develop accurate recommendations

7.2

3 Expand on previous work and results from Tasks 6.1 to 6.3, including 7.1, to develop accurate recommendations for future work.

Resources

  • Development of the Receding Horizon Planner
  • Sensitivity analysis of the gimbal prototype
  • Completion of Milestone 6

Milestone Hazards and Risks

The completion of Milestone 7 is only affected by the work done in previous milestones. If previous tasks are delayed, any future recommendations run the risk of not being completed.

To prevent this from affecting the final stages of the project, the plan/timeline outlined should always be followed, noting wher

Cite This Work

To export a reference to this article please select a referencing stye below:



Reference Copied to Clipboard.


Reference Copied to Clipboard.


Reference Copied to Clipboard.


Reference Copied to Clipboard.


Reference Copied to Clipboard.


Reference Copied to Clipboard.


Reference Copied to Clipboard.

Related Content

Featured review

Reviews.co.uk logo

“Thank you UK Essays for your timely assistance. It has helped me to push forward with my thesis.”


Tajeram M

Related Services

View all

DMCA / Removal Request

If you are the original writer of this essay and no longer wish to have the essay published on the UK Essays website then please request removal.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
Live Chat+1 763 309 4299EmailWhatsApp

We Can Handle your Online Class from as low as$100 per week